The constructions involved the replacement of oil pipelines (no. 3 – 10”, no. 1 – 12”, no. 1 – 16”,
no. 1 – 20”) for the transportation of petroleum products laid on sleepers along the bank wall of the Polcevera stream. These pipelines interfered with the new road section to be built side by side to the Polcevera stream and so they have been relocated below the riverbed.
Upgrading of the working plan regarding the replacement of SIGEMI oil pipelines, which interfered with the new road section to be built on the right bank of the Polcevera stream between the two bridges of Rivarolo and Campi in the municipality of Genoa.
The work plan described above was upgraded, according to the new Customer requirements and the change of the companies responsible for the construction of the new road section.