The operations in the pump room involved the amendment and adjustment of tanks, dismantling and removal of equipment (pumps, valves, piping sections), painting pipes, footbridge adjustments and other. Regarding the access of petroleum products from Genoa S. Quirico through pipelines 10” L05A and L01 SQ / LA electromechanical operations have been performed, along with the installation of new equipment in the control and technical rooms.